Macon, GA

Case Study

Challenge:

Hyrdogen Sulfide

During plant renovations. Macon had an upset in the WWTP and lost their biological community. They reached out to provide bioaugmentation support to get the plant back on line and back to normal operating conditions. In addition, Macon asked for product to help with one of the collection system lines experiencing extremely high H₂S levels.

Solution:

Within just four days, the Macon wastewater treatment plant was trending back toward normal operations. After three months of implementing the Greener Planet Systems solution, Macon reported a significant increase in decant quality and volume, along with noticeable reductions in accumulated solids and odors.

Based on these results, Macon asked Greener Planet Systems to address an additional challenge within the collection system: elevated hydrogen sulfide (H₂S).

Monitoring at the Macon Ocmulgee Lift Station initially recorded H₂S concentrations of approximately 350 ppm. Following implementation of the solution, H₂S levels declined to approximately 130–150 ppm, representing a reduction of roughly 57–63% from the initial level.

The Macon project demonstrates how Greener Planet Systems can address multiple wastewater challenges—from solids and odors at the treatment plant to H₂S within the collection system—through solutions designed around the facility’s specific operational needs.